beautypg.com

Transportation and installation, 3 installation, 1 delivery – Great Plains P13929 User Manual

Page 11: 2 transportation

background image

11

Single Beam Toolbar

Operating Instructions

Transportation & Installation

2.3 Installation

When carrying out installation and
maintenance work there is a higher risk of
injury. It is important that you familiarise
yourself with the component and read the
Operating Instructions beforehand.

2. Transportation and

Installation

Transportation and initial installation of the
machine are described in this chapter.

2.1 Delivery

The Toolbar unit is normally delivered, fully
assembled, on a (low-bed) truck.

The machine can be lifted off with a crane,
fork-lift truck, or other suitable lifting
equipment.

When doing so, the weight, the centre of

gravity and the attachment points on the unit
are to be taken into account.

Depending on the lifting gear, attachment is

only to be at appropriate points on the frame.

2.2 Transportation

The Single Beam Toolbar can be transported
on public roads by hitching it up to a tractor or
on a low-bed truck.

The Single Beam Toolbar unit must be lifted
clear of the ground for road transport if
transported behind a tractor.

• It is important to observe the permitted
dimensions and weights when transporting the
machine.

• Use suitable lifting gear, e.g. a fork-lift truck.

• If the machine is transported on a trailer or a
flat-bed truck, it must be secured using straps
or other devices.

• Before transporting the machine on public
roads, it must be adjusted to its transportation
position and the stipulations relating to road
transportation fulfilled.

• The maximum permissible speed is 25 km /h.

2.4 Hitching-up the machine

When hitching-up the machine,
ensure that no-one is between the
tractor and the machine.

• Attach the machine to the tractor 3 point
linkage.