Quick setup guide for intelliag model yp40 15, Step 12: 5 revolution test, 4step 13: summary screen – Great Plains YP4025-3135 31 Row 35 cm Quick Start User Manual
Page 4: Step 11: clutch folding module operation
Quick Setup Guide for IntelliAg Model YP40 15”
11001-1533-200909
©2009 DICKEY-john Corporation
Specifi cations subject to change without notice.
STEP 12: 5 Revolution Test
Press the Control Setup button
.
Press the Channel Setup button
.
Press the Next Page button
.
Ensure implement is raised before starting 5 Rev Test.
With brakes locked and transmission in PARK position, start tractor engine.
Engage hydraulics and run engine at normal speed until hydraulic fl uid is at operating
temperature.
Press the 5 Rev button
.
Test Ground Speed and Row data must be entered to perform test.
Press and hold remote test button to initiate 5 Rev Test.
1.
2.
3.
4.
5.
6.
7.
8.
9.
4
STEP 13: Summary Screen
The Summary screen provides an overview of setup constants for active control channels.
At the Main Work screen, press the Next Page button
.
Press the Summary button
To view specifi c control channel confi gurations, press the respective control channel
box 1-4.
Press inside a yellow highlighted box to open a specifi c screen for editing.
Press the Work Screen button
to return to the Main Work screen.
1.
2.
3.
4.
5.
Summary
Screen
STEP 11: Clutch Folding Module Operation
The planter section controls turn the left, center, and right clutch controls on and off.
The master switch must be in the ON position to activate any planter section. When a
clutch control is ON, a green light will illuminate.
Marker/Fold Switch should be in the UP (Marker) position during planting. In the
DOWN (Fold) position, the switch controls the fold of the main frame.
The fertilizer pump switch is turned ON when in the UP position. Press the switch in
the DOWN position to turn OFF.
Lift/Hitch switch should be in the UP (Lift) position during normal operation. In the
hitch position, the switch should be in the DOWN (Hitch) position to unlock and
extend the telescoping tongue in preparation of folding the implement for transport.
Lift/Hitch switch MUST be in the hitch position and hydraulic circuit in FLOAT when
transporting planter equipped with hydraulic-operated tongue hitch. NOTE: Lift/Hitch
switch has no function if planter has standard 3-point hitch operated tongue hitch.
1.
2.
3.
4.
5.
6.
MASTER
Left Center Right Marker Fert. Pump Lift
MASTER
MASTER
CLUTCH
Fold Hitch
Master
CFM Switch
Marker
or
Fold
Fertilizer
Pump
On/Off
Lift
or
Hitch