Unitec WashPay Card Terminal Retrofit User Manual
Page 6
W A S H P A Y
Document Number:
WP1004
6
Document Title:
WashPay Card Terminal Retrofit Installation Instructions
5. Locate the Coin Input wire from the IDX timer.
6. Trace the wire in order to find where it connects to the coin acceptor output.
7. Run a wire from this junction to the COIN IN 1 position on the distribution board inside the
card terminal box.
8. Connect 24VAC o the 24VAC Hot and 24VAC Common positions onhte distribution board.
9. Connect a wire to from the 24VAC Load on the distribution board to the 24 VAC Load on the
IDX Timer. This wire should also the the wiper position of the rotary switch.
10. Apply power to the Card Terminal and meter box and test.
Note: The coin acceptor power connection is optional.
Please refer to the Documents and Downloads tab at
additional documents:
WashPay Site Server Installation Manual
WashPay Owners Manual
Sierra Management Application Programming Manual