After completing installation, Dynamic vehicle check – Trail Master Suspension TM3325-40013 JEEP WRANGLER 4 DOOR (JK) 2.5 SPACER KIT User Manual
Page 7
7
10. Install the lower rear shock mount to the axle
mount using the previously removed OE hard-
ware. Torque to
85
ft./lbs.
11. Install the rear brake line drop (35-TM20010) to
the OE hole in the frame using the previously
removed OE hardware.
12. Reconnect the rear brake line to the rear brake
line drop (35-TM20010) using the supplied
5/16” X 1” bolt and hardware.
13. Reconnect the rear track bar and the rear lower
sway bar end links. Torque to factory specifica-
tions.
14. At full droop, cycle the steering from lock to lock
while observing the reaction of these
components. Reposition them if needed.
15. Reinstall the rear wheels and lower the vehicle
to the ground. Torque the lug nuts to factory
specifications.
16. Torque all bolts to factory specifications. Re-
torque all bolts after 500 miles.
After Completing Installation
Engine Compartment
1. Connect both battery cables. Connect positive
cable first, then negative cable.
Miscellaneous
1. Adjust headlights.
2. Check all fasteners to ensure they are tight.
3. Ensure all wires, hoses, cables, etc. are properly
connected and there is ample slack.
4. Align vehicle to OE specifications. Retain align-
ment
results.
Dynamic Vehicle Check
1. Check steering and suspension in all positions to
ensure that there is no bind and adequate clear-
ance between all moving, fixed, and heated mem-
bers. Check operation of clutch, brake system, and
parking brake. Check operation of transmission and
transfer case. Ensure there is full engagement in all
gears and 4WD ranges. Check battery connections
and electrical component operations. Test-drive ve-
hicle.
82-TM30004
Rear Shock
Extension
Rear
Shock
10mm X
80mm bolt
35-TM20010
Rear Brake
OE bolt
5/16” X 1”
bolt