beautypg.com

Bunn espress, Es•2c, Installation – Bunn ES.2C User Manual

Page 5: Plumbing, Electrical, Initial fill & heat

background image

BUNN

Espress

®

ES•2C

5

PLUMBING

Install the brewer as indicated below

INSTALLATION

WATER STRAINER

ASSY.

INLET HOSE

BUNN

90 psig max operating pressure

BOM Strainer

FLOW

From Water Treatment

24682.0000

Adaptor

24684.0000

Sealing Washer

23820.0000

Strainer Assy.

24684.0000

Sealing Washer

24683.0000

Adapter

To Espresso Brewer

Inlet Hose

FROM

WATER

SUPPLY

ELECTRICAL

CAUTION-The brewer must be disconnected from the power source until specified. Improper electrical
installation will damage electronic components.

1. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

2. When instructed to proceed, connect the brewer to the power source.

CAUTION-The brewer must be properly grounded. A plumbing line will not provide an adequate ground.

INITIAL FILL & HEAT

CAUTION-The brewer must be disconnected from the power source until specified. Improper electrical
installation will damage electronic components. Plumbing must be connected to the brewer before
proceeding.

1. Watch the tank water level gage and push the tank/boiler manual fill button. Hold the button until the water

level is visible in the sight gage.

2. Connect the brewer to the power source.

3. Place the main power switch in the “ON” position. The automatic refill function of the electronic control

system will engage at this time. The refill indicator will glow and the tank will automatically fill with water.
This switch also initiates the heating of the water in the tank/boiler.

4. Press the continuous flow button on each of the group control panels just until water flows from the group

heads. This will purge air from the lines and allow faster heating of the group heads.