Required tools, Prepare site – Vigo VG09031K User Manual
Page 4
4
NOTE: This is the recommended installation for wall mount and freestanding vanities.
NOTE: To properly secure the vanity, the center of the required 2x6 backing material
must be the correct height from the floor. This will be your desired height.
Measure and mark your desired height up from the floor. Make sure to remove the
distance of the top of the vanity without the sink to the center on the 2 mounting
vanity brackets, 5". This will be the height from the floor to the center of the 2x6
backing material. Refer to the vanity and lavatory "Roughing-In" section for proper
placement.
Option A - Front-notch the studs 1 1/2" to ensure the 2x6 backing material is flush
against the studs.
Option B - Toe nail the 2x6 pieces between the open framing. Make sure to cut the
sections wide enough to securely fit on center and make sure the 2x6 are flush with
the face of the framing to prevent the vanity from sticking too far out or not far
enough out.
Secure the 2x6 backing material to the studs with framing nails.
Rough in the water supply and drain lines into the rough-in plumbing area of the
vanity. Refer to the vanity and lavatory "Roughing-In" section for proper placement.
Note: All Rough in material is not included with the vanity.
Write down the location of the 2x6. This will benefit you when the wall is closed by
wall board, tile, etc.
NOTICE: To ensure proper alignment of the lavatory, drawer and door: The finished
wall must be straight and plumb. The floor must be flat and perpendicular to the finished
wall.
NOTICE: Do not install any moldings that may inhibit the vanity from being flush against
the finish wall.
ADJUSTABLE
BASED OFF
DESIRED HEIGHT
REQUIRED TOOLS
Plus
Framing Nails
Siliconized Acrylic Caulk
Adjustable Wrench
Plumber's putty or Caulking
Pipe Tape
Tubing Cutter or Hacksaw
Caulking Gun
2x6 Backing Material
Rubber Mallet
PREPARE SITE
WARNING: Risk of property damage. Do not modify the vanity in any way. Doing so will compromise the structural stability of the vanity and may cause
property damage.
NOTICE: Siliconized acrylic caulk must be used to secure the lavatory to the vanity. Do not use 100% silicone sealant, which will damage the finish of the vanity.
Observe all local plumbing and building codes.
Two people should install this product.
Vigo Industries reserves the right to make revisions in the design of products without notice, as specified in the Price List.
BEFORE YOU BEGIN
ADJUSTABLE
BASED OFF
DESIRED HEIGHT
OPTION A
FRONT-NOTCH
OPTION B
TOE NAIL
(Not included)
!