beautypg.com

Terrawave solutions – TerraWave 802.11n MIMO Site Survey Battery Pack User Manual

Page 6

background image

TerraWave Solutions

®

MIMO Site Survey Battery Pack (Part # TW-SSBP-007)

Instructions For Use

Version 2.0 - Page 6

www.terrawave.com Email: [email protected] Phone: 210-375-8482 or 800-851-4965 10521 Gulfdale, San Antonio, TX 78216

Key Points to Understand:

1. Site Survey Battery Pack should power any access point or bridge for at least 6-8 hours given that the Site Survey

Battery Pack has been fully charged.

2. The POE port is designed to power 48 Volt POE access points only.
3. When not in use, turn the switch (labeled Switch in Diagram 1) to the “Off / Charge” or LEFT position and the Master

Battery On/Off switch to the “Off” or RIGHT position to switch the battery pack completely off. Do NOT store the
battery pack in 56v or 48v switch positions. Also turning the Master Battery On/Off switch to the “Off” position will
ensure that there is no drain on the battery and will help extend battery life.

4. The Charger (shown in Diagram 2) is designed to be international power capable. If it is going to be used outside of

North America, then the appropriate adapter for that country should be used.

5. The Site Survey Battery Pack supports only 802.3af compliant access points and does not support the legacy Cisco

power protocol solutions.

6. The operating temperature range for the Site Survey Battery Pack is -13°F to 149°F.




Disclaimer:
TerraWave Solutions is not liable for any damages to equipment, property or persons by the improper use of this Site Survey
Battery Pack in any manner. It is imperative to know the proper use of this device.



Warranty:
The Site Survey Battery Pack and Charger are covered by a 6 month warranty. The warranty period starts from the date of
purchase and does not cover damage to the unit from misuse, physical abuse or improper charging. Damages to the case
are also not covered. TerraWave Solutions will replace the unit within the first month of purchase if it is deemed necessary.
Within the six month warranty period, TerraWave Solutions will repair the unit if it is determined that the problem is caused by
a manufacturer defect or malfunction.


Instructions for proper storage of the Site Survey Battery Pack:
The Site Survey Battery Pack utilizes a 12V sealed lead acid battery. Sealed lead acid batteries should not be stored on their
side for a long period of time. The sealed lead acid battery inside the Site Survey Battery Pack is mounted on its side if the
Site Survey Battery Pack is sitting on its rubber feet. While this is fine for days of use, the Site Survey Battery Pack should be
normally stored while sitting on its back side with all ports facing up to ensure the longest battery life.