Sunnex PF2006-32 User Manual
Page 6
![background image](/manuals/573679/6/background.png)
Sunnex Inc. is ISO 9001-2000 certified
6
5.2 PF Ceiling (PF2017-44)
Ceiling Mount - 50W - Plug-in transformer
A. Securely fasten lamp down tube from ceiling. It is
recommended that 6-5/16" diameter or larger fasteners of
the proper length for your individual application be used. Be
sure down tube is securely mounted to structural framework.
Down tube should be mounted plumb and square to ceiling
surface.
B. Be sure transformer plug is not plugged into power
source at this time.
C. After down tube support is secured plug electrical
connectors at the end of the down tube support and lamp
arm together.
D. Remove the two Phillips head screws supplied in lamp
mounting bushing, insert lamp mounting bushing into down
tube barrel.
Line up screw holes through the down tube and the lamp
mounting bushing and securely tighten fasteners.
E. Plug lamp transformer into electrical outlet.
F. Test operation of lamp
CAUTION! The arm is equipped with friction joints. Do
not tighten the joints excessively as this will cause
uneven movement and could damage the arm.
PF CEILING DOWN TUBE
Refer to first page for dimensions
30.19”