Operation, Operating elements and operation, Operating elements and their functions – Retsch AS 200 tap 30.025.1001 User Manual
Page 11

8 January 2008
Retsch GmbH
11
Doc. no. D 98.025.9999
Operation
Operating elements and operation
Operating elements and their functions
Overview table
Element
Description
Function
A
Tapping arm
Transmits tapping pulses to the material being
sieved.
B
Lock hook
Locks the noise insulating hood
C
Clamping lever
Allows adjustment to the different sieve stack
heights.
D
Sieve plate
Holds the sieve stack
E
Sieve lid
Centres the sieve stack and holds the cork
stopper.
F
Cork stopper
Transmits the tapping pulses to the sieve lid.
G
Display and operating unit:
See below for explanations.
Time preselection and starting/stopping the
machine
M
START press button
No function
A
B
F
E
D
C
G
M
See also other documents in the category Retsch Equipment:
- BB 50 (41 pages)
- BB 100 (24 pages)
- BB 200 (24 pages)
- BB 300 (24 pages)
- Cryomill (68 pages)
- CryoMill Autofill 50l (28 pages)
- DM 200 (20 pages)
- DM 400 (60 pages)
- Emax (67 pages)
- GM 200 (44 pages)
- GM 300 (44 pages)
- MM 200 (32 pages)
- MM 400 (32 pages)
- PM 100 (44 pages)
- PM 400 (36 pages)
- PM GrindControl (48 pages)
- RM 200 (36 pages)
- RS 200 (32 pages)
- SK 100 (24 pages)
- SM 100 (48 pages)
- SM 200 (48 pages)
- SM 300 (44 pages)
- Cyclone - SM 300 (20 pages)
- SR 200 (24 pages)
- SR 300 (24 pages)
- TWISTER (44 pages)
- ZM 200 (32 pages)
- AS 200 jet - Automatic Vacuum Regulation (6 pages)
- AS 200 control - natural frequency (32 pages)
- AS 200 (36 pages)
- AS 200 jet (56 pages)
- AS 200 jet (48 pages)
- AS 200 tap 30.025.0001 (28 pages)
- AS 300 (32 pages)
- AS 400 (32 pages)
- AS 400 (28 pages)
- AS 450 basic (40 pages)
- AS 450 basic (44 pages)
- AS 450 control (52 pages)
- DR 100 (40 pages)
- DR 100 (28 pages)
- PP 25 (32 pages)
- PP 40 (28 pages)
- PT 100 (36 pages)