beautypg.com

Pivot assy – Multiquip STXD6i User Manual

Page 30

background image

page 30 —sTxd6i RIde-ON TROWeL • paRTs maNuaL — Rev. #2 (1/23/13)

PIVOt assy.

TIGHTENING SEQUENCE

1

2

3

4

7

8

5

6

1

2

2

5

6

7

8

10

3

4

22

23

16

12

13

17

20

19

18

15

19

20

10

8

8

5

7

6

18

12

13

14

11

10

21

21

LEFT

RIGHT

BLUE

LOCTITE

24

3

1

2

APPLY BLUE LOCTITE #246 x 8

1

APPLY BLUE LOCTITE #246 x 12

2

APPLY MINIMAL AMOUNT OF LPS ANTI-SEIZE GREASE TO THREADS OF SCREW (ITEM 4).

HAND START SCREWS. FOLLOWING TIGHTENING SEQUENCE (SEE DIAGRAM ABOVE).

TORQUE SCREW ASSEMBLY (FIRST PASS) TO A VALUE OF 21 FT-LBS (28.47 N.m). FOLLOW

SAME SEQUENCE FOR FINAL TORQUE OF 41 FT-LBS (55.59 N.m).

CLEAN WITH NON-PETROLEUM BASE CLEANER BEFORE INSTALLING ITEMS 8 AND 10.

3

4

NOTES:

SEAL

KIT

25