beautypg.com

Mayline CSII Team Table User Manual

Page 2

background image

1. Place the Work Surface (1) face down onto a clean, protected surface.

2. Align the holes in the Post Leg mounting plate with the pre-drilled holes in the Work Surface. Secure the Leg

using four Screws (E1).

3. Thread the Post Leg onto the mounting plate.

4. Place the two Adjacent Tables at the location where they are to be used. Position the two tables tightly together.

5. Align the holes in the right and left Team table legs with the holes in the adjacent table legs. Attach each Team
Table Leg with three Screws (E2) and three KEPS Nuts (E3). DO NOT tighten screws at this time.

NOTE: The Team Table product may not be used in conjunction with

Drawer Pedestals mounted on the ends of the adjacent Table assemblies.

(2)