APG RCU-7000 user manual User Manual
Page 9

Rev. A1, 4/07
RCU-7000 Series
9
Automation Products Group, Inc.
APG...Providing tailored solutions for measurement applications
Tel: 1/888/525-7300 • Fax: 1/435/753-7490 • www.apgsensors.com • [email protected]
• Installation
After unpacking, open shipping cartons of unit and inspect the units
for shipping damage. If there is evidence of damage, notify the carrier
immediately. Also verify the contents for properly ordered units.
Unpacking
This relay unit has been thoroughly inspected and carefully packed at the
factory to prevent from damage during shipment. When unpacking, care
must be taken not to damage the instrument with mechanical shock. After
unpacking, visually check the instrument exterior for damage.
Note the following points:
• Remove the relay unit from the package carefully. Also, take out the
socket from the package if ordered.
• Model number of the relay is indicated on the nameplate. Check it to be
sure if it is as required.
• Check exterior for damage. If there is, contact APG.
Installation Location
This relay unit should be installed in an area with the following conditions:
1. Provide ample space for maintenance/inspection.
2. Low relative humidity and no exposure to moisture.
3. No corrosive gases. (Such as HN
S
, SO
2
, C1
2
, etc)
4. No excessive vibration.
Installation of Relay Unit
This relay unit installation method depends on the mounting type, either 11
pin socket or DIN rail.
The socket (Omron 11PFA) for relay unit is optional.