Echo MS-41BP User Manual
Page 4
INSTALLING THE PUMP HANDLE
The pump handle can be mounted on either side of the pump
shaft (A). To install the pump handle place the handle (C)
over the shaft (A) aligning the pump handle hole and shaft
hole. Slide the bolt (B) through the aligned hole as shown in
figure 1 thru 4. Tighten nut (D) to bolt. There are holes in the
pump handle to allow for either left(fig.4) or right (fig.5) hand
mounting.
3E
SPRAYER COMPONENTS & USE INFORMATION, Continued
Figure 1
Figure 2
Line up holes
Figure 3
Slide bolt through holes
Figure 5
Left Hand
Figure 6
Right Hand
Pump Handle
Positioned For Use
(right hand shown)
A
C
B
Figure 4
Tighten nut to bolt
Threaded Bolt
Nylon Lock Nut
D
O-ring
Wand
Retaining Nut
Shut-off
Valve
WAND ASSEMBLY
1. Make sure the o-ring is installed on the end of the wand. Insert the wand into shut-off valve.
2. Turn and tighten the retaining nut clock-wise onto the shut-off valve.
- GT-225 (32 pages)
- SRM-210 (32 pages)
- SRM-225 (44 pages)
- SRM-225 (24 pages)
- PAS ARTICULATING HEDGE CLIPPER ATTACHMENT PAS-2601 (20 pages)
- 670-200 (20 pages)
- PE-2000 Type 1/1E (30 pages)
- X7502026001 (36 pages)
- SB (56 pages)
- PAS RAPID LOADER 99944200610 (16 pages)
- 99944200610 (24 pages)
- SRM-261SB (16 pages)
- SRM-210SB (32 pages)
- PAS-230 (24 pages)
- PAS-230 (24 pages)
- PAS-230 (32 pages)
- PAS-260 (42 pages)
- PAS-261 (25 pages)
- 2410 - Type 2E (32 pages)
- GT-201 (28 pages)
- POWER PRUNER PPT-2400 (16 pages)
- HC-155 (32 pages)
- HC-155 (36 pages)
- Trimmer (20 pages)
- SRM - 265U (36 pages)
- HC-150 (28 pages)
- HC-235 (32 pages)
- HC-225 (32 pages)
- BLADE CONVERSION KIT 231 (8 pages)
- TC-2100 (28 pages)
- SRM-400 (20 pages)
- SRM - 260S (28 pages)
- 54 (4 pages)
- HCA-2400 (36 pages)
- CULTIVATOR PRO ATTACHMENT 99944200513 (16 pages)
- RM-5000 (68 pages)
- SRM-265T (44 pages)
- SHC-210 (28 pages)
- 2110 (37 pages)
- PE-3100 Type 1/1E (28 pages)
- SRM-265S (42 pages)
- SRM - 230U (32 pages)
- SRM-225I (36 pages)
- 99944200553 (16 pages)
- 99944200553 (24 pages)