Echo CH4400 Instruction v.2 User Manual
Page 2
ECHO BEAR CAT
www.bearcatproducts.com
237 NW 12th Street, West Fargo, ND 58078-0849
Phone: 701.282.5520 • Toll Free: 800.247.7335 • Fax: 701.282.9522
E-mail: [email protected] • [email protected]
6. Belt guides should be set to a 1/8" gap between belt
and belt guide. Torque the four bolts that hold the belt
guides to 19 ft-lbs.
7. Position the belt engagement lever in the start posi-
tion and reinstall the belt covers and hardware.
8. Start the machine. (If the chipper disk is rotating with-
out the engagement lever engaged the belt guides
will need to be moved slightly closer to the belt.)
Make sure guides do not touch belt when engage-
ment lever is engaged.
9. The belt guides are properly set when the chipper
disk has little to no movement at start up, when the
engagement lever is in the start position.
BELT GUIDE INSTALLATION KIT, PART #77654-00
ITEM
PART #
DESCRIPTION
QTY
1
15250
WASHER, 5/16" FLAT ZP
4
2
15381
BOLT 5/16-24X3/4" GR5 HHCS ZP
4
3
77652-12
WELDMENT, BELT GUIDE
2
4
77653-00
INSTRUCTIONS, CH4400/XE BELT GUIDE INSTALLATION
1