15 air compressor, Normal startup procedure, Normal shutdown procedure – JLG 740AJ ANSI Operator Manual User Manual
Page 86: Daily operation, 15 air compressor -20, 15 air compressor normal startup procedure
SECTION 4 - MACHINE OPERATION
4-20
– JLG Lift –
3121650
4.15
AIR COMPRESSOR
Normal Startup Procedure
1.
Check compressor oil level - top up if necessary.
2.
Air service valve (beside the compressor) closed.
3.
Start the engine.
4.
Compressor switch (in the platform) ON - compressor should
activate.
5.
Allow the compressor to warm up for several minutes before
operating.
Normal Shutdown Procedure
1.
Close service valve and allow compressor to unload and cool
down (approx. 5 min.).
2.
Position the compressor switch in the platform to OFF.
3.
Shut down the engine.
Daily Operation
Before Starting:
1.
Check compressor oil level.
2.
Check for any leaks or loose bolts.
3.
Check drive belt is tight.
After Starting:
1.
Check pressure gauge for correct operating pressure.
2.
Check for leaks.
- 120HX Service Manual (116 pages)
- 544D-10 Parts Manual (730 pages)
- 100SX Parts Manual (224 pages)
- 450A Operator Manual (68 pages)
- 15DVL (3121839) Parts Manual (126 pages)
- E450 Operator Manual (116 pages)
- E450 Operator Manual (106 pages)
- G5-18A Operator Manual (142 pages)
- 2505H Operator Manual (148 pages)
- 40HA ANSI Parts Manual (322 pages)
- 400RTS Service Manual (100 pages)
- 600S_SJ Parts Manual (302 pages)
- 660SJ Parts Manual (404 pages)
- 660SJ Parts Manual (306 pages)
- 660SJ Parts Manual (382 pages)
- 660SJ Parts Manual (352 pages)
- 660SJ Parts Manual (310 pages)
- 600S_SJ Parts Manual (299 pages)
- 19AMI (3120758) Service Manual (68 pages)
- 500RTS ANSI Service Manual (80 pages)
- 400RTS ANSI Service Manual (98 pages)
- LSS Scissors (78 pages)
- 510AJ Series II Operator Manual (104 pages)
- 800S Operator Manual (158 pages)
- 800S Operator Manual (130 pages)
- 35xxPS Operator Manual (176 pages)
- 400RTS ANSI Operator Manual (48 pages)
- 500RTS ANSI Operator Manual (46 pages)
- 800A_AJ Operator Manual (134 pages)
- 800A_AJ Operator Manual (150 pages)
- 266 Operator Manual (140 pages)
- G6-42A Parts Manual (478 pages)
- G9-43A Parts Manual (788 pages)
- M400AJP Narrow (108 pages)
- E400 Operator Manual (118 pages)
- 80HX_HX+6 ANSI Operator Manual (104 pages)
- 1350SJP Quick Reference Guide (1 page)
- 1350SJP Quick Reference Guide (2 pages)
- 15VPSP (3120798) Parts Manual (98 pages)
- X14J Operator Manual (169 pages)
- 400S ANSI Service Manual (464 pages)
- X17J Plus Operator Manual (176 pages)
- 20AM Operator Manual (98 pages)
- 3369LE Operator Manual (84 pages)
- 3369LE Operator Manual (86 pages)