Daily walk-around inspection (sheet 3 of 3) -8 – JLG 800A_AJ Operator Manual User Manual
Page 34

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
2-8
– JLG Lift –
3121627
13.
Fuel Tank - See Inspection Note.
14.
Swing Drive Motor and Brake - See Inspection Note.
15.
Door and Latches - Hood door and latches in working con-
dition, properly secured, no loose or missing parts.
16.
Tie Rod and Steering Linkage - See Inspection Note.
17.
Dual Capacity and Horizontal Cutout Limit Switches if
equipped - Properly secured, no damage to the switches,
arm free to move, and free from dirt and grease.
18.
Battery - Proper electrolyte levels; cables tight, no visible
damage or corrosion.
19.
Hydraulic Pumps - See Inspection Note.
20.
Tower Boom - No visible damage; wear pads secure. All cyl-
inders - rod end pins and barrel-end pins properly secured.
21.
Frame - See Inspection Note.
22.
Main Boom Sections - No visible damage; wear pads
secure. All cylinders - rod end shafts and barrel-end shafts
properly secured.
23.
Upright - In vertical position, relative to the chassis. Refer to
Figure 2-7. and Figure 2-8. If out of alignment, do not use
machine until the upright has been synchronized in accor-
dance with Section 4.16.
Figure 2-4. Daily Walk-Around Inspection (Sheet 3 of 3)