Eppendorf CO2 Back-up System User Manual
New brunswick™ co, Back-up system
Table of contents
Document Outline
- 1 Operating instructions
- 2 Safety
- 3 Product description
- 4 Transport, storage and disposal
- 5 Introduction
- 6 Installation
- 6.1 Before installation
- 6.2 Selecting the location
- 6.3 Unpacking the device
- 6.4 Temperature sensor installation
- 6.5 Manifold-to-solenoid valve transfer line assembly
- 6.6 Solenoid valve to freezer installation
- 6.7 Installing more 0.6 m (2 ft) transfer lines to manifold
- 6.8 CO2 gas supply installation
- 6.9 Test for gas leaks
- 6.10 Door switch installation
- 6.11 Installing cables to back of control unit
- 7 Operation
- 8 Maintenance
- 9 Technical data
- 10 Declaration of conformity