48 oz – Bunn B8 User Manual
Page 6

6
OF
F
O
N
PREPARING THE BREWER FOR USE
NOTE - THE BREWER IS NOT READY TO PLUG-IN.
48
oz
Raise the hinged flip-lid.
Close the lid and plug-in the brewer.
Slide an empty brew funnel into the brewer under
the warmer switch and place an empty decanter on the
warmer. Pour two pitchers of water (filled to the 48 oz
line) into the screened area on top of the brewer. Wait
two minutes between pitchers to allow the water to fill
the tank. When the tank is full, some water will flow
through the funnel and into the decanter.
P-199
P-196
P-214
P-219
Press the bottom of the vacation switch, located on the
lower left side of the brewer, to the "ON" position.
The vacation switch controls power to the tank heater.
Initially you will have to wait approximately fifteen
minutes in order for the water to reach brew
temperature.
Empty any water that has collected in the decanter.
You’re not done yet! The next page leads you through the five
easy steps to ‘BREWING DELICIOUS COFFEE’
- A-10 (12 pages)
- CEZ-TS (32 pages)
- CDBC-DV (37 pages)
- CWT APS (2 pages)
- CWT-TSR (33 pages)
- CWT-TS (24 pages)
- CRT5 CRTF5 (32 pages)
- CWTF-TSR-MV (31 pages)
- Dual Voltage Models Starting at Serial #CDBC024477 CDBCF TC (32 pages)
- CRT5 (32 pages)
- XL M-2 (2 pages)
- CDBCF15-TC (2 pages)
- C (59 pages)
- C (32 pages)
- ESPRESS ES2C (17 pages)
- VPR (17 pages)
- CRT5 (7 pages)
- WL2 (2 pages)
- A10 Automatic (6 pages)
- 120/208V (2 pages)
- EASY POUR WX1 (2 pages)
- ES2SA (35 pages)
- BT10 (3 pages)
- TU3Q-EZ (22 pages)
- TWIN APS (32 pages)
- DUAL GPR-DBC WITH SMART FUNNEL 41343 (38 pages)
- VP17A (24 pages)
- VP17A (8 pages)
- AXIOM BREWWISE 39131.0004B (19 pages)
- CEZF CDBC (36 pages)
- VLPF (28 pages)
- BX-B (16 pages)
- ESPRESS ES.1AF (12 pages)
- 37614 041410 (7 pages)
- CWTF TWIN (35 pages)
- VPR TC (12 pages)
- Titan Single Brewer (2 pages)
- AutoPOD Brewer 41167.0001B (13 pages)
- Coffee Warmer (3 pages)
- CWTF-TC (1 page)
- VPR VPS (5 pages)
- BTC (12 pages)
- Tiger Super Automatic Espresso Machine with Steam Wand XL S-2 (2 pages)
- CWT APS-DV (31 pages)
- Dual TF DBC (56 pages)