Mueller 9x12 D.I.Y. Greenhouse User Manual
Page 22

Mueller, Inc. 9 x 12 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video
22
HINT: Screw corner of ridge
roll and middle first to
maintain pitch. Install
remainder of screws.
SKYLIGHT RIDGE ROLL INSTALLATION
CAUTION: Use scaffold boards (not included) for support
while installing roof sheets and trim.
Install lap screws
on ridge roll every
12 inches.
Ridge Roll
Foam Block
(under Ridge Roll)
Foam Block closes the gap
in between the closures.
Roof Panel
Outside
Closure
Lap TEK
Screw