Mueller 6x9 D.I.Y. Greenhouse User Manual
Page 4

Mueller, Inc. 6 x 9 D.I.Y. Greenhouse Instructions
4
NoTe: Leading and trailing edge of
channels are overbent for a tight
fit. Spread apart as needed to
nest the purlin into the channel.
Base LaYouT (Bc-1 aND Bp-1)
Leveling and proper blocking is
critical for the base layout.
Bc-1
(Base channel)
Bc-1
(Base channel)
Bp-1
(Base purlin)
Bp-1
(Base purlin)
sTep 1
Insert BP-1 into BC-1
Triangles are for
door centering
sTep 2
Add MKB-1 (Galvanized MKB-2)
to top of BP-1 into BC-1
sTep 3