beautypg.com

Installing the airdog, Ii & mounting bracket, The truck’s frame jig bracket – PureFlow AirDog DF-165-4G - GM Duramax 2015+ User Manual

Page 9

background image

9

PureFlow AirDog

AirDog

®

II-4G 2015 and UP DuraMax Diesel

Section 4 AirDog

®

II & Mounting Brackets

Installing the AirDog

®

II & Mounting Bracket

on

the

Truck’s Frame Jig Bracket!

.

Out to ENGINE FUEL IN


4-1 Install a 1/2” male J2004 quick connect x 3/8”

NPTF (08J2044-3/8NPTF) into the “ENGINE”
and “FUEL IN” ports in the AirDog II.

Figure 7

4-2 Install the 3/8” male J2004 quick connect x 1/8” NPTF (06J2044-1/8NPTF) into the

“TANK” port of the AirDogII. This is the smaller port next to the port marked
“ENGINE”.

Figure 7a

WARNING: The NPT fitting threads must be lubricated with oil or anti-seize compound before
installation to prevent galling!


4-3 Assemble the AirDog II to the formed mounting bracket (part # 001-3C-0004).

4-4. Mark mounting hole locations on frame jig bracket using the mounting bracket (001-3C-

0004) as a template. Or create a paper template from the mounting bracket (001-3C-
0004). Be sure to line the template up as described in order to get the proper clearance
needed when pump is installed.








Figure 9

Figure 10

4-5.

After holes are marked drill (4) 3/8” holes for the mounting bolts.


4-6. Attach the completely assembled Airdog to the frame jig bracket.