beautypg.com

Electrical hook-up (models without power cord), Electrical hook-up (models with power cord), Electrical requirements – Bunn DUAL SH DBC DUAL068000 User Manual

Page 4

background image

Page 4

ELECTRICAL HOOK-UP (Models without power cord)

CAUTION – Improper electrical installation will damage electronic components. Damage caused by incorrect

electrical connections is not covered by warranty.

1. An electrician must provide electrical service as specified in conformance with all local, state and federal

electrical codes.

2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

3. Remove the front panel beneath the sprayheads to gain access to the terminal block.

4. Feed the cord through the strain relief and connect it to the terminal block.

5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re-

place the front panel.

6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing

has been hooked up, the brewer is ready for Initial Set-Up.

ELECTRICAL HOOK-UP (Models with power cord)

WARNING – If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service

personel with a special cord available from the manufacturer or its authorized service personel in order to

avoid a hazard. Improper electrical installation will damage electronic components. Damage caused by

incorrect electrical connections is not covered by warranty.

1. An electrician must provide electrical service as specified in conformance with all local, state and federal

electrical codes.

2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

NOTE - If the brewer was shipped without a plug on the power cord a qualified service personnel must

select and install the proper UL listed grounding type attachment plug specified on the rear of the brewer.

3. Remove the front panel beneath the sprayheads to gain access to the terminal block.

4. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.

5. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumb-

ing has been hooked up, the brewer is ready for Initial Set-Up.

WARNING – Electrical connections must be made as specified above. Failure to follow these instructions can

result in personal injury, property or equipment damage.

ELECTRICAL REQUIREMENTS

WARNING - The brewer must be disconnected from the power source until specified in Initial Set-Up.

Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.

200 and 230 volt ac models

Note: This electrical service consists of 2

current carrying conductors (L1 and L2)

and a separate conductor for earth ground.

120/208 and 120/240 volt ac models

Note: This electrical service consists of 3 cur-

rent carrying conductors (Neutral, L1 and L2)

and a separate conductor for earth ground.

29877-3 051007

L2

L1

G

L2 RED

GREEN

GREEN

L1 BLACK

L2 RED

L1 BLACK

L2

N

L1

G

L2 RED

WHITE

GREEN

GREEN

NEUTRAL

L1 BLACK

L2 RED

WHITE
NEUTRAL
L1 BLACK