Operation – Bloomfield B-446 User Manual
Page 9
OPERATION
7
PREPARE THE CHAR-BROILER FOR USE
When using the broiler for the first
time, wipe the entire unit with a clean
damp cloth or sponge and mild
detergent. Rinse thoroughly clean
water. Dry with a soft clean cloth.
Remove the GRATE and raise the
ELEMENT ASSEMBLY.
Install the DRIP PAN and add
2” (5cm) of tap water.
Release the ELEMENT SUPPORT
ROD by lifting the element assembly
slightly, then pulling the lower portion
of the support rod forward. Lower the
ELEMENT ASSEMBLY gently.
MODEL B-406: Grate must be
installed ABOVE elements.
Install the GRATE, front edge first.
The TANGS of the grate go DOWN
and point toward the FRONT. The
grooves on the underside of the
grate align with the elements. The
rear edge of the grate can be
lowered until it rests firmly on the
elements.
MODELS B-446 and B-506: Grate(s)
can be installed above or below the
elements.
ABOVE: Gently lower grate over
elements. The end with flush tabs
goes toward the front.
BELOW: Install one wing bolt in
each tab. The notch in the wing
rests on the lip of the drip pan. The
end with flush tabs must go toward
the front Adjust the wing bolts so
that , when the element assembly is
lowered, the top of the element is
1/4" (6mm) below the top of the
grate fins.
CAUTION:
Hot Surface
Exposed surfaces can be hot
to the touch and may cause
burns.
IMPORTANT: DO NOT
attempt to raise the element
assembly without first
removing the grate. Damage
to the hinges will result. Such
damage is NOT covered by
warranty.
IMPORTANT: Allow drip pan
to cool before removing from
the broiler.
DO NOT operate the broiler
without the drip pan installed.
DO NOT operate the broiler
without 2” (5cm) of water in
the drip pan.
IMPORTANT: DO NOT
attempt to lower the element
assembly without first
releasing the support rod.
Damage to the hinges will
result. Such damage is NOT
covered by warranty.
HANDLE
ELEMENT
GRATE TANG
FRONT
Fig. 4 ELEMENT SUPPORT ROD
Fig. 5 B-40 GRATE INSTALLATION
Fig. 6 B-44 and B-50 GRATE INSTALLATION
162
303
673
OpM
anual
for
Buil
t-In
El
ectric Charbroi
lers