Belshaw Brothers BARO-2E User Manual
Page 2

BELSHAW BROTHERS, INC. • Belshaw-Adamatic Bakery Group • 814 44th St NW, Suite 103, Auburn WA 98001
Phone: 206-322-5474 | 800-578-2547 Fax: 206-322-5474 • [email protected] • www.belshaw.com
©11/2007 Product specifications may be changed without notice. Always obtain current spec sheet at time of purchase.
Dimensions
BARO-2E
Overall width
72” (1830 mm)
Overall height
104.5” (2655 mm)
Overall depth (inc. hood)
95.0” (2530 mm)
Depth at floor (not inc. hood)
62” (1575 mm)
Net weight
3380 lbs (1537 kg)
Shipping weight
4380 lbs (1991 kg)
Crate size
113”L x 70”W x 94” H
Crate volume
430 cu. ft.
Freight class
70
Electrical
BARO-2E
120V-60-1
E-1 connection 12 A 1.5 kW
208V-60-3
E-2 connection 145 A 52 kW
240V-60-3
E-2 connection 125 A 52 kW
480V-60-3
E-2 connection 63 A 52 kW
BARO-2E: Double Rack Oven, Electric
INSTALLATION REQUIREMENTS
Requires on-site installation
•
KD shipment. When disassembled, can fit through 36”
•
opening
Consult factory for shipment fully assembled
•
112” Floor to ceiling height required for tip-up
•
Non-combustible floor supported by non-combustible
•
structure
Zero clearance required from combustible surfaces on
•
side and back
ELECTRICAL
Two electrical connections
•
For Controls/Lift and rotate (E1 on diagram): 1/2” EMT,
–
120 VAC 1-Phase
For circulation blower and heaters (E2 on diagram):
–
1-1/4” EMT, 208-240V or 480V 3-Phase
VENTILATION
8” Round vent collar (consult local codes for installation
•
requirements)
800 CFM Roof vent (not included)
•
WATER SUPPLY & DRAINAgE
Supply: 1/2” NPT (9 GPM@40 psi)
•
Drain: 3/4” NPT (210°F, 1 GPM) vented
•
Line to be dropped from ceiling
•
Connection will be located 100” above finished floor, 5.5”
•
from the left side of the oven, 6” from the rear of the
oven
Oven comes pre-installed with water pressure regulator,
•
water pressure gauge, water solenoid and shut-off valve
Your local water conditions may damage your appliance.
•
Failure to properly treat water may result in damage and
may void your warranty. Ensure that your water supply
meets these minimum water quality specifications:
Alkalinity:
22 ppm
–
Aluminum:
17 ppm
–
Calcium:
3.3 ppm
–
Free chlorine residual: 0.6 ppm
–
Magnesium:
0.65 ppm
–
PH range:
8.5 s.u.
–
Sodium:
8.5 ppm
–
Total Hardness: 11.9 ppm
–
Consult your local water treatment company for proper
•
water filtration system.
5.50
5.81
36.00
Ø 8.00
E1
W
D DRAIN Connection
WATER Connection
ELECTRICAL
Connections
VENT
Connection
104.88
72.25
95.0
108.25
62.00
86.00
99.75
55.00
1.50
[Front View]
[Side View]
[Plan View]
E2
86.75