The manometer port permits temporary installation of a
manometer (Figure 5), to ensure that the engine receives
the correct fuel pressure to operate efficiently throughout
its operating range.
NOTE: A digital manometer, P/N 19495, is available at your
local Briggs and Stratton Power Products service center.
When the initial test runs are completed, the manometer is
removed and the port is plugged. A typical final fuel
connection assembly is shown in Figure 6.
Fuel Consumption
See Figure 7 for fuel supply requirements at half and full
load for both natural gas and LP vapor.
13
Briggs & Stratton Power Products Standby Generator
Installation, Start-Up and Owner’s Manual
• Before placing the Standby Generator into service, the fuel
system lines must be properly purged and leak tested.
• NO leakage is permitted.
Propane and Natural Gas are extremely
flammable and explosive.
Fire or explosion can cause severe burns or
death.
WARNING
Figure 6 — Completed Fuel Connections
From Fuel
Supply Line
To Standby
Generator
Figure 5 — Temporary Manometer Installed
Natural Gas*
LP Vapor**
1/2 Load
Full Load
1/2 Load
Full Load
80
137
33
56
* = Natural Gas is in cubic feet per hour
** = LP Vapor is in cubic feet per hour
Figure 7 — Fuel Supply Requirements