beautypg.com

Ash removal instructions – New Buck Corporation FS 21 User Manual

Page 26

background image

Page 24

ASH REMOVAL

INSTRUCTIONS

(3)

DUMP CHANNEL.

SWEEP ASHES INTO ASH

ASH DUMP TOP LID AND

REAR OF HEATER. OPEN

DUMP TOP LID IN RIGHT

FIRE BOX. LOCATE ASH

OPEN MAIN DOOR TO

(4)

BE PLACED ON A NON COMBUSTIBLE FLOOR

UP TO 72 HOURS AFTER REMOVAL.

THOROUGHLY COOLED. ASHES CAN IGNITE

CONTAINER UNTIL ASH CINDERS HAVE

SHOULD BE RETAINED IN THE CLOSED

OTHERWISE LOCALLY DISPERSED, THEY

DISPOSED OF BY BURIAL IN SOIL OR

FINAL DISPOSAL. IF THE ASHES ARE

ALL COMBUSTIBLE MATERIALS, PENDING

OR ON THE GROUND, WELL AWAY FROM

CLOSED CONTAINER OF ASHES SHOULD

WITH A TIGHT FITTING LID. THE

BE PLACED IN A METAL CONTAINER

DISPOSAL OF ASHES: ASHES SHOULD

NOTE:

OF ASHES PROPERLY.

FROM PEDESTAL AND DISPOSE

OF REAR NOTCH. REMOVE PAN

LID AND LIFT ASH PAN OUT

WHEN FINISHED, CLOSE TOP

(4)

NOTE: IF HEATER IS EQUIPPED WITH OPTIONAL ROOM BLOWER BE

SURE TO TURN BLOWER OFF BEFORE REMOVING ASHES

TURN BLOWER ON.

REPLACE ASH PAN IN PEDESTAL.

(6)

(5)

(5)

(6)

ASH DUMP
CHANNEL