Installation instructions, Step 1: rough in piping for shower – Bradley Smoker HN200 User Manual
Page 4
ADA Compliant Recess-Mounted Shower
HN200
Installation Instructions
Bradley Corporation • 215-1189 Rev. F; EN 02-342
4
Installation Instructions
NOTE: Flush the supply lines before making connections.
NOTE: Install the supply inlets no lower than 48" and no higher than 60" off of finished floor.
Step 1: Rough in piping for shower
NOTE: When facing the wall, the supply pipe to the left of the centerline is HOT.
1. Rough in 1/2" NPT hot and cold water supply piping for valve at the dimension shown in Figure
1 (piping supplied by installer).
2"
(51mm)
1/2" NPT
SUPPLIES
40"
(1015mm)
2-1/2"
(64mm)
TYP.
45"
(1143mm)
7-1/2"
(191mm)
NOTE: WALL OPENING RECESS
TO BE 4" (102mm) DEEP
C
L
3-3/4"
(95mm)
2"
(51mm)
NOTE: Due to differing state codes, if the
valve height is different from the indicated
43" (1091 mm), all dimensions within the
symbol must be changed by the same amount.
Example: If the code approved height is 40",
then 43" (1091mm) - 40" (1015mm) = 3"
(76mm). Result: Subtract 3" (76mm) from all
dimensions within the symbol.
15"
(381mm)
48"
(1219mm)
A.F.F.
18"
(457mm)
WALL
OPENING
OUTLINE
Figure 1
20"
(508mm)
38-1/8"
(968mm)
A.F.F.
72"
(1829mm)
A.F.F.
48"
(1219mm)
to 60"
(1524mm)
A.F.F.
BACK
WALL
FRONT OF
SHOWER