SECTION IV
RESIDENTIAL FREESTANDING
INSTALLATION
Select an installation location that will give best airflow from front of heater to
remainder of home.
PREPARING STOVE FOR INSTALLATION
1. Inspect unit for any obvious physical damage.
2. Plug power cord into a 115V AC outlet to test motor. “Do not run power cord under unit or
in high traffic areas”.
3. Check primary air and control to ensure that it slides freely.
4. Remove any items from within firebox. Spread a dropcloth on floor behind heater.
Next, tilt heater so that back is on drop cloth.
5. If leg kit is to be used follow steps 1-4.
6. Then obtain four legs, attach legs to holes in bottom of unit with bolts and washers supplied
with leg kit. (See Figure 9).
7. Reposition heater to upright position.
Figure 9