www.cglifesciences.com
[email protected]
Installation:
Step 1: Assemble reactor system, with vessel, lid and stirrer shaft
complete with agitators. Stirrer shaft should extend above the center
neck of the lid.
Step 2: Attach the lower PTFE joint adapter and remove the stainless
steel spindle nut and PTFE ferrule.