Set up / operation – Chemglass CG-1171-50 User Manual
Page 3

3
Power Cord with
mounted Switch
“IN” Flow indicator
Figure 1
Set up / Operation:
•
Mount Pump to Scrubber Stand using the integral mounting plate/handle.
•
Connect 1/2” tubing to compression fittings. Note arrows indicate flow direction.
•
Insert power cord into electrical outlet (voltage 115VAC).
•
Turn power cord mounted switch “ON”.
“OUT” Flow indicator
Mounting Plate with Handle