Domes – Fypon Domes User Manual
Page 2
General Installation Notes
Any adhesives, sealants, fillers or paint used must be compatible with the material that is being installed
(see manufacturer’s recommendations in the
Finishing and Adhesives section below).
Always use corrosion-resistant mechanical nails or screws along with manufacturer’s recommended adhesive
product when installing all Fypon products. This combination provides a secure, long-lasting bond. Countersink all fasteners about
1
/
8
" and fill with
product compatible filler. Exterior installations should be finished using a manufacturer’s recommended caulk to prevent water infiltration behind
siding, windows and doors. Some exterior installations, in particular new construction before siding is applied, may require a J-channel and/or
flashing to prevent water infiltration. Installers must determine which installation technique is best for the specific situation.
Finishing and Adhesives
Polyurethane (PUR) – Fypon polyurethane products are factory primed. Depending on product location, always use interior/exterior-grade, PUR
compatible adhesives, sealants, and fillers when installing Fypon products. Consult the manufacturer’s recommendations for your particular
climate and the substrate you are installing to.
Cellular PVC – Depending on product location, always use interior/exterior-grade, PVC compatible adhesives, sealants, and fillers when installing
Fypon products. Consult the manufacturer’s recommendations for your particular climate and the substrate you are installing to. If painting is
desired, a 100% acrylic latex paint with a Light Reflectance Value (LRV) of 55% or higher must be used.
Applying paint with an LRV of 54% or
lower will void the warranty.
IMPORTANT:
Please read these installation guidelines thoroughly before beginning installation. Please note that these guidelines are provided only to assist with the installation of Fypon moulding
and millwork products. Modified procedures may be required in order to meet specific situations, unique applications and local building codes. The manufacturer does not, under any
circumstances, warrant the installation of its products. Be sure to wear appropriate protective clothing, gloves and safety glasses when working with any tools. Installer should check
for and relocate all electrical wiring within the proposed installation area, as needed (be sure to disconnect all electric power before working with any electrical wiring and follow all
applicable local electrical codes and safety procedures).
Fypon, Ltd. 1750 Indian Wood Circle
Maumee, Ohio 43537
1.800.446.3040
www.fypon.com
Page 2 of 2
Domes
Continued
secure into the rough opening framing, driving non-corrosive fasteners up through the rim, through the ceiling and into the framing. Slightly
countersink fasteners, so that you can cover the heads with polyurethane compatible filler for a finished appearance.
For Suspended Ceilings: Raise the dome into position. Tie construction wires directly into the suspended ceiling hanger system to suspend
the dome. If installing a light fixture, you must support the fixture with additional framing that is properly attached to the ceiling or suspended
ceiling support system. Do not support the fixture by attaching it to the dome.
Touch Up and Painting
Fill nail heads and any other minor imperfections with polyurethane compatible filler (interior applications) or an exterior grade wood filler
(exterior applications). After the filler has dried, sand any minor surface imperfections. Use polyurethane compatible filler where the dome
meets the ceiling. Paint with latex paint (interior or exterior depending on application).