beautypg.com

Rolling rack – American Bicycle Security Company Rolling Rack User Manual

Page 4

background image

American Bicycle Security Company

P.O. Box 7359

Ventura, CA 93006

Ph: (800) 245-3723 or (805) 933-3688

Fax: (805) 933-1865

www.ameribike.com

Email:

[email protected]

*Tools Needed for Installation

Level

Cement mixing tub

Shovel

Trowel

Hole coring machine with 4” bit

Access to water hose

Materials to build brace

Rolling Rack

In-Ground Mounted Installation

Installing into Existing Concrete

Installing into New Concrete

Core holes no less than 3”
diameter (4”recommended)
& no less than 10” deep into

surface

Place rack into
holes, making

sure it is level

Fill holes with epoxy
grout. 32” of the bike
rack should remain above
surface.

Make sure
rack is level
& held in
place until
the grout
has
completely

set.

*An easy way to brace

the rack while the grout

sets is to bolt two 1x4”

boards together at one

end and clamp them onto

the legs of the rack like a

clothes pin.

1.

2.

3.

4.

Place corrosion resistant sleeve (min.

3" inside diameter) in sand pour bed

in exact location where rack will be

installed. Make sure top of sleeve is

at same level as desired finished

concrete surface. Fill sleeve with

sand to keep it in place and prevent

it from filling with concrete.

Pour concrete
& allow to
cure.

After curing, dig out sand
from sleeves & insert racks,
making sure they are level &
at the appropriate height.

Place racks in holes,
making sure it is

level.

1.

2.

3.

4.

Rail Mounted Installation

Installation Steps: