Silver King SKDD4 User Manual
Page 2
1
TECHNICAL MANUAL
SILVER KING PREPARATION TABLES
MODELS SKDD2, SKDD3, SKDD4
Thank you for purchasing Silver King food service equipment. Our goal is to provide our customers with the most reliable
equipment in the industry today. Please read this manual and the accompanying warranty information before operating your new
Silver King unit. Be sure to complete and mail the warranty card within 10 days of purchase to validate your warranty.
INSPECT FOR DAMAGE AND UNCRATE
Upon delivery of your new Silver King unit, uncrate at once to inspect for possible freight damage following the instructions printed
on the exterior of the container. Report any damages to the carrier responsible for transportation and promptly present a claim for
any evidence of mishandling. Silver King is not responsible for any damages incurred during shipping. Save all packaging
materials if a claim is filed.
The back bar cooler was shipped on a skid. We recommend not removing the unit from the skid until it is as close as possible to the
desired end location.
INSTALLATION
The exterior surfaces of the cabinet have been protected by a plastic covering during manufacturing and shipping. This covering
can be readily stripped before installation. After removing this covering, wash the interior and exterior surfaces using a warm, mild
soapy water solution and a sponge or cloth, rinse with clean water and dry.
Location
When locating your new back bar refrigerator, convenience and accessibility are important considerations, but the following
installation guidelines must be followed;
• Always avoid placing the cooler adjacent to an oven, heating element or hot air source that would affect the operation of the
unit.
• For proper ventilation the cooler can be installed tight on the sides and back with the rear bumpers installed. The front must
be unobstructed.
• The unit must be level or tilted backwards slightly.
• If the unit is not on legs or casters it should be sealed to the floor with an NSF approved sealant to prevent water from getting
under the unit.
• The cooler has a drain connection for overflow beer. There should be a floor drain nearby.
Draft Towers
Two single tap Draft Towers are supplied with each direct draw beer cooler. The Draft Towers mount to the top of the cabinet with
four screws supplied. Be sure to install the rubber gasket supplied between the cabinet top and tower. After the Draft Towers are
attached to the cabinet, insert the one inch diameter chill hoses supplied inside the cabinet, up into the draft towers. Remove the
top covers of the Draft Towers and hook the clip on the chill hose over the insulating sleeve at the top of the Draft Tower. Replace
the top covers. The chill hoses direct cool air into the Draft Tower to ensure cool beer in the towers. Consult beer distributor if
uncertain of proper installation.
Drain
The overflow drain connection is located at the bottom front of the cabinet. To plumb the drain connect a ¾ inch drain tube (not
supplied) to one of the barbed fittings (leave other side capped) and run the drain tube to a floor drain.
CO2 Gas Manifold
A CO2 Gas Manifold, located on the left hand interior wall, is included in each direct draw beer cooler. Also included is tubing and
clamps for connecting the CO2 lines from the tappers (supplied by beer distributor) to the manifold. A ‘knockout’ plug is provided in
the left hand wall of the cabinet to provide access for a CO2 supply line from a remote CO2 cylinder to the manifold. Caution: CO2
tanks are potentially dangerous due to their internal pressure. If you are uncertain of their use or the connecting CO2 regulator it is
highly recommeded that the local beer distributor or service agent connects the CO2 system and tubing initially to assure proper
procedure.