Hardware requirements – Bloom Manufacturing LS23K Series User Manual
Page 6
Section 4
Winch Break In
• Winches, like any other kind of machinery, require a “break in” to perform well and
to maximize their life.
• Use extreme care when first spooling cable onto the winch. Do not run the winch at
p
g
high speeds when performing this operation.
• Make sure that the cable is unrolled in a line ( to prevent kinks ) and slowly inhaul
the winch to install the cable.
• Do not exceed one half rated load or one half rated line speed for the first thirty
minutes of operation. This will ensure that the gears have an opportunity to wear
in properly.
Periodically check the gearbox for temperature rises and allow the winch to cool
CAUTION
Y
t k
th t
i h i
l
t d i d f it t f
ti
• Periodically, check the gearbox for temperature rises and allow the winch to cool
down between pulls.
Section 5
Winch Installation
• You must make sure that your winch is securely mounted in order for it to function
properly and to ensure safe operation.
• The mount must be flat to ensure proper alignment between the gearbox side, the
drum, and the clutch.
• Winches must never be fastened directly to the frame of a truck. Mounting
brackets should be used.
• With a hydraulically driven winch, make sure the hydraulic system is clean and
CAUTION
Winch Series
y
y
,
y
y
that all components function properly, especially the relief valve.
LS21H, LS22H, LS23H
Base Mount (steel)
Thickness
5/8”
11 UNC
5
HARDWARE
REQUIREMENTS
Capscrews (Hexhead)
Size
Thread
Grade
1-1/4”
,
,
LS21K, LS22K, LS23K
5
Grade
Torque / Tightening
(foot pounds)
115
THINK S-A-F-E-T-Y FIRST Bloom Mfg Inc. 319-827-1139
PAGE 6 OF 8 2007