American Dryer Corp. D20 User Manual
Page 13
9
C. DRYER ENCLOSURE REQUIREMENTS
Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of
6-inches (15.24 cm) above the dryer’s outer top; except along the front of the dryer which may be closed if
desired.
NOTE: Allowances must be made for opening the control door.
X = 12-inch (30.48 cm) minimum, 24-inches (60.96 cm) is suggested for ease of maintenance.
NOTE: Air considerations are important for proper and efficient operation.
Dryers may be positioned sidewall to sidewall. However, a 1/16” (1.5875 mm) minimum allowance must be
made for the opening and closing of the control door and the lint door. It is suggested that the dryer be positioned
about 2 feet (0.61 meters) away from the nearest obstruction for ease of installation, maintenance, and service
(to be measured from the back guard). Refer to the illustration above for details.
- SL2929 (8 pages)
- AD-15 Phase 7 (31 pages)
- ML-75DIII (65 pages)
- AD-236 (33 pages)
- AD-50V (61 pages)
- ML-96HS (38 pages)
- 75 lb (6 pages)
- SL2020 (8 pages)
- AD-758DV (52 pages)
- Aquatex AD-76 (36 pages)
- MDG-75 (66 pages)
- MLG-130DR (HSI) (45 pages)
- MLG31PCB (44 pages)
- AD-410 (72 pages)
- AD-75THS (49 pages)
- Direct Spark Ignition ADG-530DSi II (33 pages)
- MLG32PD3 (39 pages)
- ML-55 (52 pages)
- ML-96 (34 pages)
- ADG-410 (75 pages)
- ADG-320D (53 pages)
- Phase 7 Gas/Steam AD-464 (62 pages)
- AD-120ES (50 pages)
- Gas/Electric/Steam ML-55HS (56 pages)
- AD-840 (47 pages)
- MDG31 (26 pages)
- Aquatex AD-52 (37 pages)
- Phase 7 D30 (39 pages)
- 30 lb. Stacked Models (26 pages)
- ADH-120 (46 pages)
- ML-96D (43 pages)
- Super AD-50 (54 pages)
- ML-122 (52 pages)
- SL31 (12 pages)
- Super AD-30 (63 pages)
- MDG30V (52 pages)
- AD-670 (60 pages)
- SL31AD-15 (72 pages)
- ADS-464 II (80 pages)
- ML-190 (42 pages)
- Heat Reclaimer AD-170HR (20 pages)
- 50 lb. Single Pocket MDG50V (52 pages)
- 24 VAC Phase 5 AD-330 (40 pages)
- D75 (42 pages)