AMX Rough-In Box CB-TP7 User Manual
Cb-tp7, Installation guide, Specifications
Installation Guide
CB-TP7
Rough-In Box for 7" Wall/Flush Mount Touch Panels
Overview
The CB-TP7 Rough-In Box is an optional accessory for 7” Modero® Wall/Flush Mount
Touch Panels. The Rough-In Box allows the panel to be mounted directly to the studs/
pre-wall and includes a wall box and mounting screws.
Wall Mount panels (NXDs) are contained within a metallic outer housing (back box).
This back box is not removed when installing the NXD into a Rough-In Box. The back
box is only removed to gain access for the replacement of the Compact Flash
component or upgrade to the VESA housing.
Specifications
WARNING: INSTALLER, LEAVE A GAP BETWEEN THE STUD AND ROUGH-IN
BOX TO ACCOMMODATE THE DRYWALL/SHEETROCK.
This gap allows the installation of the drywall/sheetrock after the CB-TP7 has been
mounted onto the beams. The rough-in box installation must be done prior to any wall
installation.
Note: The most important thing to remember when mounting this rough-in box is that
the mounting tabs must be mounted flush against the outside of the sheetrock.
It is recommended that you cut out the surface slightly smaller than what is outlined in
the installation drawings so that you can make any necessary cutout adjustments.
The wiring knockouts on the left side will be used for the NXD-CV7 Wall Mount panel
connectors, so always secure the rough-in box to the stud using the Stud Mounting
Holes on the right side of the box.
Pre-Wall Installation of the CP-TP7 Rough-In Box
•
Refer to the SP225802 diagram for detailed installation dimensions (see
reverse).
•
Cutting out the surface slightly smaller than what is outlined in the installation
drawings, in order to make any necessary cutout adjustments, is highly
recommended.
•
The wiring knockouts on the left side will be used for the NXD-CV7 Wall Mount
panel connectors, so always secure the rough-in box to the stud using the Stud
Mounting Holes on the right side of the box.
1.
Remove the rough-in box cover (A in FIG. 1) before installation of the Rough-In
Box (B). Note: the cover MUST be removed before drywall installation. The
cover may be reinstalled after drywall installation using 4-40 screws (not
included)
.
2.
Rest the right Stud Mounting tabs onto the stud (keeping the knockouts on the
left). Be sure to leave enough of a gap between the stud and NXD Mounting tabs
to accommodate the installation of the drywall or sheetrock after the rough-in
box has been mounted. Ultimately, the Mounting Tabs should lie flush against
the outside of the sheetrock.
3.
Fasten the CB-TP7 rough-in box to the stud through the holes on the right Stud
Mounting tabs (FIG. 2), using either nails or screws.
4.
Remove the wiring knockouts from the left side of the CB-TP7 to accommodate
the cables being threaded through to the NXD touch panel.
Note: Remember that when mounting this rough-in box, the NXD mounting tabs must
lie flush against the outside of the sheetrock.
5.
Thread the incoming power, RJ-45 audio/video, Ethernet, and USB wiring
through the knockouts (use of the left wiring knockouts are recommended with
this installation). Leave enough slack in the wiring to accommodate any re-
positioning of the panel.
6.
Install the drywall/sheetrock before inserting the main NXD unit into the CB-TP7.
CB-TP7 (FG035-10) Specifications
Dimensions (HWD)
• 5 1/2" x 7 1/4" x 3 3/8"
• 13.9 cm x 18.4 cm x 8.6 cm
Included
Accessories
• 2 Phillips pan-head (#4-40 x 0.250 Black) screws
Certifications
• UL 508A
FIG. 1 CB-TP7 Rough-In Box with cover
2 locations to secure cover
after applying drywall
2 locations to secure cover
after applying drywall
(8-32 x .25 screws)
A
B
FIG. 2 CB-TP7 - Drywall Installation
Stud
Rough-In Box
Front surface of
mounting tabs should
be flush with outside
face of drywall
Drywall
Do Not Use these
tabs to mount
the Rough-In Box
See reverse for
detailed dimensions
Rough-In Box
must be installed
with knockouts on
this side