Alternatively, Scorpion front panel settings may be set manually and ap-
plied during the automated measurements under PATS software as fol-
lows:

q

On the Measurement Window click the Pause button

q

On the Scorpion front panel press the “Clr / Local” button to take
manual control of the Scorpion.

q

Use Scorpion front panel controls to set the desired settings and/or
to perform a new calibration. (Note: Unless a new calibration is per-
formed, the manual settings must be consistent with the calibration
to be applied).

q

Use the “Save Cal File to PC.” (Refer to Appendix A for detailed in-
formation on how to use the “Calibration Specification Files.”

4-4

TEST EQUIPMENT

A power meter, power sensor, and Type N calibration component kit is re-
quired for power level and S-parameters calibrations. See Table 1-2, page
1-12.

TEST EQUIPMENT

OPERATIONS, CALIBRATION

4-2

ME 7840A POM