Installation, Installation 3.1 installation – KROHNE DK 37-H250 M8 ATEX II2G Ex i EN User Manual
Page 11
INSTALLATION
3
11
DK37/M8 - H250/M8
www.krohne.com
09/2013 - 4000760402 MA DK37 M8 AD II2G R02 en
Installation
3.1 Installation
Installation and setup must be carried out according to the applicable installation installation
standards (e.g. EN 60079-14) by qualified personnel trained in explosion protection. The
information given in the Installation and Operation Instructions and the Supplementary
Installation and Operation Instructions must always be observed.
Variable area flowmeters must be installed in such a way that
• There is no danger from mechanical impact effects.
• There are no external forces affecting the indicator part.
• The device is accessible for any visual inspections that are necessary, and can be viewed from
all sides.
• The nameplate is clearly visible.
• It can be operated from a location with secure footing.
CAUTION!
The manufacturer is not liable for any damage resulting from improper use or use other than the
intended purpose. This applies in particular to hazards due to insufficient corrosion resistance
and suitability of the materials in contact with product.
AD_DK37_H250_M8_II2G_R02_en_760402_PRT.book Page 11 Friday, September 13, 2013 8:45 AM