beautypg.com

En g l is h english – Pfister R89-8YPY User Manual

Page 3

background image

E

N

G

L

IS

H

ENGLISH

ENGLISH

7 TRIM FLANGE ATTACHMENT

Position Flange (7A) on Valve (7B) with Drain Hole (7C) at the bottom. Place

Protective Washer (7D) on the short end of the reversible Retainer Sleeve (7E).

Screw Retainer Sleeve (7E) onto threaded section of the Stem and Bonnet (7G).

Tighten Retainer Sleeve (7E) by hand until Flange (7A) is snug to fi nished wall

surface. If the short end of the Retainer Sleeve (7E) is too short, reverse it to

use the longer end.

8 HANDLE ATTACHMENT

Screw Stem Extender (8A) onto Valve Stem (8B). Thread Set Screw (8C) into

Handle (8D) and thread it in only three to four turns. Place Handle (8D) onto

Stem Extender (8A) and tighten Set Screw (8C) by using Hex Wrench (8E) that

is provided.

Make sure Set Screw (8C) is securely tightened to handle (8D).

10 SPOUT INSTALLATION

Apply PTFE plumbers tape on both ends of Pipe Nipple (10A) (not included).

Screw Pipe Nipple (10A) into the elbow inside the wall and tighten with pipe

wrench. The Pipe Nipple (10A) is to project 3

7

/

8

" to 4" from the fi nished wall.

Screw Tub Spout (10B) onto Pipe Nipple (10A) and tighten until Spout is properly

positioned and fl ush to the fi nished wall.

11 UNIT START UP

Turn on hot and cold water supplies, and check all connections for leaks.

9 SHOWER ARM INSTALLATION

Insert the end of Shower Arm (9A) through the Shower Flange (9B). Apply PTFE

plumber's tape to both ends of Shower Arm (9A) according to manufacturer's

instructions. Screw the end of Shower Arm (9A) into pipe elbow inside the wall.

Slide Shower Flange (9B) tight to the wall and tighten set screw (9C).

7

8

9

10

3

7A

8A

9A

7B

7C

7C

7D

7E

7G

8B

8C

8D

8E

9B

10A

3

7

/

8

” to 4”

10B

9C

Allow a minimum of 8”

clearance between the

center of shower hole and

ceiling.

This manual is related to the following products: