En g l is h english – Pfister GT532-7SS User Manual
Page 4
E
N
G
L
IS
H
ENGLISH
ENGLISH
14
13
17
15
16
12
12 PULLOUT HOSE CONNECTION
From underneath sink, push Quick Connect Housing (12A), located on the end
of the Pullout Hose (12B) fi rmly upward onto Receiving Tube (12C), until unable
to push any further. Pull down on Quick Connect Housing (12A). If the housing
and Inner Collet (12D) separate slightly but do not pull off, the Receiving Tube
(12C) quick connect is secure.
13 WATER SUPPLY LINES
Gently separate hot and cold supply tubes (13A), approximately three inches
apart. Connect water Supply Lines (13C) to Faucet Inlets (13B). Hot water
supply line goes to hot inlet fi tting indicated by red tag (13D). (Supply lines
and fi ttings are not included.) Please follow manufacturer’s instructions when
installing supply lines.
14 SECURING INLET LINES
Do not cross Pullout Hose Connection (14A) with Inlet Supply Tubes (14B) to avoid
binding, jamming and interference with the movement of the pullout hose.
15 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the
sink.
16 FLUSHING
To prevent damage to the internal parts of your faucet from debris that may
have collected in the water lines, it will be necessary to fl ush the faucet. Lift
the faucet handle (16A) up to the full on position. Run water for one minute.
Repeat in hot and cold positions.
17 SPRAY HEAD INSTALLATION
Assemble Sprayhead (17A) to Pullout Hose (17B) by turning the metal Hose
Fitting (17C) clockwise.
Caution: do not over tighten!
4
17A
14A
13A
12A
12A
12B
12C
12C
12D
12A
13A
13C
13C
13B
13B
14B
14B
16A
17B
17C
17A
17C
13D
HOT
COLD