5installation: printable a4 drilling template – Hochiki FIRElink-NANO User Manual
Page 9

FIRElink-NANO Air Sampling Detector – Installation and User Manual
Page 9 of 21
© 2010 Hochiki Europe (UK) Ltd 9-5-0-425/ISS1/JUL10
5
Installation: Printable A4 Drilling
Template
Lower clearance
Remember to leave sufficient space
underneath the detector to allow
screwdriver access to the cover fixing
screw and any cable gland fixed to the
bottom of the detector.
The screw is M6 x 15 panhead
Pozidrive.
Upper clearance
Remember to leave sufficient
clearance above the detector for the
cable glands and pipe inlet stubs.
3 x wall fixing screw holes
Use M4.5 pan-head screws suitable for
the wall to which the detector is to be
fixed.
NOTE: The positions of the cross-hairs on this
drawing act as an accurate drill
template only if the page is printed at
DIN A4 paper size with Print Scaling
disabled. This is normally part of the
main Print menu, and is usually
enabled by default.