beautypg.com

American Dryer Corp. MDG50MNV User Manual

Page 22

background image

18

4. Electrical Connections

A wiring diagram is located inside the control box for connection data.

If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord/pigtail
(wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker
panel. In both cases, a strain relief must be installed where the wiring enters the dryer.

IMPORTANT: A separate protected circuit must be provided to each dryer.

Single-Phase (1ø) Wiring Connections/Hookup

The electrical input connections on ALL single-phase (1ø) gas dryers are made into the rear service box
located at the upper left area of the dryer.

A ground lug is provided in the rear electrical box to connect your service ground.

FOR 110V APPLICATIONS

Single-Phase Electrical Lead Connections

Black

+

Positive

White or Red

+

Neutral

or L2

Green

+

Ground

This manual is related to the following products: