Trap instructions, Additional features, Wire the connections between the operators – Chamberlain MADCBB User Manual
Page 18: Set the dip switches at the trap operator, Set the dip switches at the second operator, Reconnect the power and test

18
INSTALL THE K1 AUXILIARY RELAY AND CONNECTOR AT MEGA ARM
CONNECTED TO THE ACCESS DEVICE
1. Press the relay into the K1 location ensuring the pins are properly aligned.
2. Press the connector into the J1 connector pins.
INSTALL THE K1 AUXILIARY RELAY AND CONNECTOR AT THE SECOND
1. Press the relay into the K1 location ensuring the pins are properly aligned.
2. Press the connector into the J1 connector pins.
WIRE THE CONNECTIONS BETWEEN THE OPERATORS
1. Connect the Normally open output (NO) of the K1 relay on the trap operator to
the OPEN input (J5 - term#2) of the second operator.
2. Connect the common output (C) of the K1 relay of the trap operator to the
common of the second operator (J5 - term#12).
3. Connect the Normally open output (NO) of the K1 relay on the second operator
to the INTERLOCK input of the trap operator (J5 - term#8).
4. Connect the common output (C) (J5 - term#12) of the second operator to the
common of the trap operator (J5 - term#12).
SET THE DIP SWITCHES AT THE TRAP OPERATOR
1. Set switch bank S1 to 00100001 where 1 is up and 0 is down.
2. Set switch bank S2 to 00100010 where 1 is up and 0 is down.
SET THE DIP SWITCHES AT THE SECOND OPERATOR
1. Set switch bank S1 to 00100000 where 1 is up and 0 is down.
2. Set switch bank S2 to 00100010 where 1 is up and 0 is down.
S1
1
ON
2 3 4 5 6 7 8
1
ON
2 3 4 5 6 7 8
Close
Loop
S2
OFF
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
OFF
OFF
1
ON
2 3 4 5 6 7 8
1
ON
2 3 4 5 6 7 8
S1
S2
OFF
OFF
ON
ON
ON
ON
ON
ON
OFF
OFF
ON
ON
ON
ON
ON
ON
RECONNECT THE POWER AND TEST
1. Reconnect the DC power by replacing the neutral (Black) wire to the battery
terminal.
2. Reconnect the AC Power to the operator.
3. To test, activate the following sequence of inputs:
• Open the trap gate using the access device.
• When the trap gate is open, activate the close loop on the trap operator.
The trap gate will close and the second gate should open.
• When the second gate is open, activate the close loop on the second
operator. The second gate should close.
Mega ARM Operator
Trap Operator
S1
S1
S2
S2
TRAP CONFIGURATION
Must use trap kit. See Mega Arm Options Parts List
Mega Arm
Mega Arm Trap
Close
Loop
Close Loop Trap
Close Loop
Trap
Card Reader
Tele-entry
Radio Control
S1-6 OFF
S1-8 OFF
S1-6 OFF
S1-8 ON
C NC NO DC
C NC NO DC
Opener
Common
Interlock
OPEN
Trap
TES
TRAP SET UP
C
K1
MA
MA
ADDITIONAL FEATURES »
TRAP INSTRUCTIONS
TRAP INSTRUCTIONS