beautypg.com

Hydrotech 5600 SXT Valve Mini Water Softener User Manual

Page 7

background image

6

NOTES:

Some items may not be shown depending on timer configuration.

The timer will discard any changes and exit User Mode if any button is not pressed for sixty seconds.

User Programming Mode Steps

1. Press the Up and Down buttons for five seconds while in service,

and the time of day is NOT set to 12:01 PM.

2. Use this display to adjust the Day Override. This option setting is

identified by “DO” in the upper left hand corner of the screen.

THIS IS AN OPTION ONLY. PLEASE DO NOT ADjUST

BEFORE CONSULTING AN AUTHORIzED DEALER.

3. Press the Extra Cycle button. Use this display to adjust the

Regeneration Time. This option setting is identified by “RT” in the

upper left hand corner of the screen.

4. Press the Extra Cycle button. Use this display to adjust the Feed Water Hardness. This option setting is identified by

“FH” in the upper left hand corner of the screen.

FOR MINI-22 Softeners units only
In order to calculate the Total Water Hardness, assume that the water softener (MINI-22) is being applied to a

water supply that not only requires the removal of hardness, but also of some iron as well. Before the regeneration

frequency can be set, the compensated total hardness must be calculated to factor in the iron that will be removed

as well. To do this, you must have the results of water analysis that provides the Total Hardness in GPG (grains/

USGallon) and Iron which is usually recorded as ppm (parts per million) or mg/L (milligrams per litre).
Compensated Hardness = Total Hardness (GPG) + 4 x Iron (ppm or mg/L)

eg. Total Hardness = 25 GPG & Iron = 2 mg/L

therefore;

Compensated Hardness = 25 GPG + 4 x 2 mg/L = 33 GPG
Note: If Total Hardness has been recorded as ppm (or mg/L) in testing, divide the number by 17.1 to obtain the

Total Hardness expressed in GPG.

User Programming Mode Options

Abbreviation

Parameter

Description

DO

Day Override

The timer’s day override setting

THIS IS AN OPTION ONLY. PLEASE DO

NOT ADjUST BEFORE CONSULTING AN AUTHORIzED DEALER.

RT

Regeneration Time

The time of day that the system will regenerate (meter delayed, timeclock,

and day-of-week systems)

H

Feed Water Hardness The hardness of the inlet water - used to calculate system capacity for

metered systems

RC

Reserve Capacity

The fixed reserve capacity

CD

Current Day

The current day of week