beautypg.com

Hudson Valley Lighting RIVERTON 2321 User Manual

Hudson Valley Lighting Lighting

background image

2321














Hudson Valley Lighting, Inc.
P.O. Box 7459
106 Pierces Road
Newburgh, NY 12550
(800) 814-3993

www.hudsonvalleylighting.com







GENERAL

1. To ensure the success of the fixture installation, the following instructions and

diagram(s) should be read and understood.
2. All electrical connections must be made in accordance with the National Electric

code and local codes and ordinances. If you are uncertain of the methods of installing

electrical wiring and lighting fixtures secure the services of a qualified licensed

electrician.

3. TOOLS NEEDED: Blade screwdriver, phillips screwdriver, slip joint pliers or small

adjustable wrench, wire cutter/stripper, electrical current tester, stepladder and

electrical tape. NOTE: The important safeguards and instructions outlined on this sheet

are not meant to cover all possible conditions and situations that may occur. It must be

understood that common sense, caution and care are factors that cannot be built into

any product. Caution and care must be supplied by the person(s) installing, operating

and maintaining this lighting fixture.

INSTALLATION PREPARATION

1. TURN OFF THE ENTIRE ELECTRICAL CIRCUIT TO WHICH THE LIGHTING

FIXTURE IS TO BE ATTACHED.

Move the appropriate circuit breaker to the “off

position or completely remove the fuse controlling the circuit.

2. If an existing fixture is being replaced, remove it and note to which of the wires in the

outlet box the fixture was attached.

DO NOT SEPARATE ANY OTHER WIRES THAT

MAY BE IN THE BOX. DO NOT DAMAGE THE INSULATION OF OLDER WIRING.

In

regular circumstances the BLACK wire will be the “Hot” lead and the

WHITE wire will be the “Neutral” or “Common” lead. A GREEN or BARE COPPER wire

is the “Ground”. In older buildings it is always good practice to reconfirm the polarity of
the wiring.

3. This fixture is designed to be mounted on a standard round or octagon box. The box

must be securely mounted to the structure of the building.

FIXTURE PREPARATION

1. Remove the fixture, shades and parts bag(s) from the carton. Before discarding the

carton, double check packing to make certain that all parts are found.

2. Assemble the stem, scroll and loop assembly to the fixture body.

FIXTURE INSTALLATION

1. Attach the crossbar to the outlet box. (The green screw should face the floor)
2. Remove the threaded ring from the screwcollar loop. Fully thread the loop onto the

nipple. Thread the hex nut onto the nipple and the nipple into the crossbar. Place the

canopy over the screwcollar loop and against the ceiling. Adjust the nipple so that ¼”

of threads on the screwcollar loop extend beyond the canopy.

Tighten the hex nut against the crossbar.

3. Open end links of chain to the screwcollar loop. Close the top link of chain. Hang

the fixture on the chain at the desired height. Remove the excess chain. Close the

bottom link of chain.4. Unscrew the ring from the screwcollar loop. Let the ring and

canopy slide down the chain to the top of the fixture. Thread the lead wires and

ground wire (first) through the ring and then the canopy. Thread the wires up through

alternating links of the chain to the outlet box.
5. Measure 6” of lead wire beyond the end of the chain. Cut off excess wire. Strip the

insulation off the ends of the leads exposing approx. ½” of wire. Twist the strands of

wire together. Push the leads and ground wire up through the screwcollar loop and

nippke and into the outlet box.

6. Fasten the green fixture wire to the green or bare copper wire in the box or fasten it

to the mounting plate with green screw provided.

NEVER FASTEN THE GROUND

WIRE TO THE BLACK OR “HOT” WIRE! FAILURE TO FOLLOW THIS

INSTRUCTION COULD RESULT IN SERIOUS INJURY OR DEATH!

7. Fasten the white fixture wire to the white wire in the outlet box. Fasten the wires to

together with an approved fastener (wire nut).Starting about 1” below the fastener,

tightly wrap connection with electrical tape so that the tape seals the end of the
fastener.Make sure that there is no exposed wire or strands that could cause a

dangerous short circuit !

8. Connect the smooth fixture wires to the black wire in the outlet

box. Fasten the joined wires as in step 7.

9. Slide the canopy and screwcollar ring up the chain and secure

the canopy to the ceiling.

10.Thread the fixture loop onto the fixture.

11.Twist the fixture body onto the nipple on the wire box.

12. Place the shades into the socket sleeves.

.13. Install the lamp(s).

NOTE: This fixture is rated for 60 watt type B, BA, C or CA lamp(s).

DO NOT EXCEED RECOMMENDED WATTAGE !

14. Restore power to circuit at breaker or fuse box.

Outlet box

Green screw

Crossbar

Nipple

Canopy

Screwcollar loop

ring

Chain

Approved fastener
(Wire nut)

Electrical tape