Intended methods of connection, Three phase wiring instruction – BJM Pumps HAZ75-575T User Manual
Page 12
11
INTENDED METHODS OF CONNECTION
Use with approved MSHA motor control that matches motor input in
full load amperes. “UTILLISER UN DÉMARREAR APPROUVÉ CONVENANT AU
COURANT Á PLEINE CHARGE DU MOTEUR.”
BJM Pumps submersible pumps have been evaluated for use with water or water
based solutions. Please contact the manufacturer for additional information.
THREE PHASE WIRING INSTRUCTION
FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP
FROM ITS POWER SOURCE BEFORE HANDLING.
“Risk of electrical shock” Do not remove power supply cord and
strain relief or connect conduit directly to the pump.
Installation and checking of electrical circuits and hardware should
be performed by a qualified licensed electrician. See the attached drawing HAZASSY1
for further electrical connection information.
To operate a manual three phase pump, a BJM MSHA approved control panel is
required.
For automatic three phase pumps a BJM MSHA approved control is required. Typical
three phase automatic wiring diagram shown below.