1. Check the following before beginning installation:

Insulation resistance measurement:
(1) For three phase motor:

With the motor and cable (excluding the power supply connections) immersed in water, use a meggar to measure the
insulation resistance between, the ground wire and each phase of the motor.

(2) For single phase motor: Use a megger to measure the insulation resistance between each wire and grounding wire

Pump Checks

1. Check the following points upon receipt of

your pump:

(1) Check the name plate to confirm that it is the pump

ordered.

(2) Ensure that the pump voltage is the same as the power

at your location.

(3) Check oil level at oil plug.
(4) Check that all plugs and fastening bolts are properly

tightened.

(5) Check that the pump has not been damaged and the

cable glands and cables are in a satisfactory condition.

(6) Check accessories and spare parts against the packing

list.

(7) Check that the impeller turns smoothly by hand.

2. Precautions when operation is suspended:
(1) If operation is to be suspended for 30 days with the pump

immersed in water, measure the insulation resistance of the
motor.
If resistance is over 1 mega ohm, operate pump to prevent
rust from developing on moving parts. Follow the instructions
under OPERATION when pump operation is to be resumed.

(2) For dry storage, clean out pump and store in a dry place.

Follow the instructions under INSTALLATION and OPERATION
when pump operation is to be resumed.

WARNING

Before insulation resistance measurement, always disconnect the power first.

All electrical work should be performed by a qualified electrician and all national and local electrical codes must
be observed.

CAUTION

When measuring the insulation resistance with meggar for motor windings do not test overload protection.

There are two different types of overload protection. One is MOTOR PROTECTION (AUTO-CUT), that is used for up to
10HP. The pump and motor could still have power to it if AUTO-CUT is kicked out.

The other is THERMAL PROTECTION (MINIATURE THERMAL PROTECTION OR MTP) that is used for 15HP to 30HP.
A MTP cable must be installed in the control circuit.

CAUTION

Measure the insulation resistance. The value should be more than 1 mega ohm. While making the measurement, keep the
power supply cable off the ground.