Installation Instructions
NS1F12-20-28-36-41
7
Completing Installation
1.
Remove and save 1/4" nut from the grounding lug on rack
rail. (See Figure 8)
2.
Attach grounding wire from door to the grounding lug. (See
Figure 8)
3.
Replace and tighten nut onto grounding lug. (See Figure 8)
Figure 8
4.
Change optional logo panel by removing and saving 4 nuts
from studs at inside top of front. (See Figure 9)
5.
Remove blank panel and replace with optional personalized
logo panel. (See Figure 9)
6.
Replace and tighten four nuts removed in Step 4.
Figure 9
LOADING THE RACK
Load Distribution
CAUTION:
BEGIN PLACEMENT OF LOAD AT BOTTOM
OF RACK! Load rack, moving from bottom toward top of rack.
Loading rack incorrectly may result in instability causing
possibly injury and/or damage to components.
1.
Begin placement of components into the rack at the lowest
point.
2.
Continue placing items into the rack, moving from the
bottom upward.
CAUTION:
DISTRIBUTE LOAD CORRECTLY! Load rack
with 2/3 total weight of components in the lower half of rack.
Loading rack incorrectly may result in instability causing
possible injury and/or damage to components.
1
3
Add grounding wire
4
6
logo panel
(front view of rack)