Tools required for installation parts – CHIEF K0 Series User Manual
Page 5
Installation Instructions
K0 Series
5
TOOLS REQUIRED FOR INSTALLATION
PARTS
#2
3/16” (included)
1/8” (included)
5/32” (included with K0P Series only)
A (1)
[monitor arm]
(K0P100)
B (4)
M4x14mm
C (4)
M4x25mm
D (4)
M10x5.3x10
included with K0W Series (wall mount) only!
E (1)
[wall bracket]
F (2)
1/4 x 2 1/2”
G (2)
1/4”
3/16”
1/8”
N (1)
P (1)
included with K0P Series (pole mount) only!
H (1)
[pole clamp]
5/32”
J (4)
1/4-20 x 1 1/2”
K (4)
1/4-20 x 1"
L (1)
or
A (1)
[monitor arm]
(K0W100)
P (1)
[iPad® interface - iPad versions only!
I2B Interface + I/M
or
I2TB Interface + I/M
+
+
M (1)
#10-24 x 1/4”