Set-up – BlueBird SC550A_968999351 User Manual
Page 18

18
SET-UP
Equipment set-up
1.
Remove crate top and sides.
2.
Cut banding straps at front and rear of unit.
See Figure 1.
3.
Remove bolts on handle using a 13 mm
socket wrench.
4.
Remove tape from bolts by handle and
remove the bolts from the nylon bushings. See
Figure 2
5.
Align handle to the three holes and replace
bolts. Tighten bolts. See Figure 3.
Cutting handle banding.
Remove handle bolts
Handle bolted to unit
FIGURE 1
FIGURE 2
FIGURE 3